Pwd Dsr 2015-16 Maharashtra !link! 【RELIABLE】
The 2015-16 DSR was widely used across Maharashtra for several reasons:
The 2015-16 DSR applied specific percentage increases (premiums) over basic rates to account for challenging working conditions or geographical locations: +5%. Notified Tribal / Hilly / Inaccessible Areas: +10%. Sugarcane Factory Areas (within 10km radius): +5%. Jail / Mental Hospital Premises: +15%. Naxalite Affected Areas (e.g., Gadchiroli): +20%. Key Technical Notes Maharashtra PWD DSR Rates 2015-16 | PDF | Masonry - Scribd
Unlike a national rate, Maharashtra’s DSR was divided into zones (e.g., Konkan, Pune, Nashik, Aurangabad, Nagpur). For example, the cost of Sand (Zone 1 - Mumbai) was significantly higher than Sand (Zone 5 - Vidarbha) due to transportation royalties.
| Clause | Detail | |--------|--------| | | Up to 500 m free. Beyond that, add per 100 m. | | Lift | Up to 1.5 m free. Beyond that, add per 3.0 m. | | Water charges | 1% of estimated cost (or as specified). | | Royalty on minor minerals | To be paid extra (not included in DSR). | | GST / VAT | Not applicable – DSR 2015-16 includes excise/VAT as per pre-GST regime (use with caution today). | | Overheads | 15% for normal works, 20% for difficult terrain. | Pwd Dsr 2015-16 Maharashtra
This section forms the core of urban development estimates, detailing precise costs per unit for structural and architectural components:
Several versions of the 2015-16 DSR for specific regions (like Thane, Raigad, Pune) are archived on Scribd for reference.
The Public Works Department (PWD) of Maharashtra plays a pivotal role in developing and maintaining public infrastructure across the state. A core tool that governs these engineering and construction activities is the District Schedule of Rates (DSR). The 2015-16 DSR was widely used across Maharashtra
Civil engineering colleges in Maharashtra (COEP, VJTI, SGGS Nanded) use the DSR 2015-16 as a case study for teaching "Quantity Surveying and Valuation" because it represents a stable pre-GST and pre-COVID inflation era.
Rates per thousand units for fly ash bricks, clay bricks, and AAC blocks. 3. Labor Rates
Beyond raw material rates, the DSR provided per-unit costs for thousands of specific construction activities. This allowed for the creation of accurate and detailed project estimates: Jail / Mental Hospital Premises: +15%
The 2015-16 DSR covers a wide range of construction and maintenance activities, typically organized by work category:
The PWD allows for percentage increases over the base rates for works carried out in challenging or specialized environments: : 5% increase. Notified Tribal/Hilly Areas : 10% increase. Government Premises (Jails/Mental Hospitals) : 15% increase.