bg

Ts1162 Installation Manual ^new^ <RECENT | SECRETS>

Note: Always verify the wiring diagram printed directly on your specific TS1162 casing, as terminal numbers can vary slightly by manufacturing batch. Terminal breakdown

The setup wizard asks:

Once you share the manual content or source, I can give you a clear, actionable review.

| Relay | Label | Recommended Load | |-------|-------|------------------| | 1 | HEATER | Max 1500W resistive | | 2 | COOLER | Compressor delay enabled (3 min) | | 3 | HUMIDIFIER | Ultrasonic only (no steam) | | 4 | DEHUM | Drain line required | | 5 | CO2 REGULATOR | 24VAC valve max | | 5 | AUX LIGHT | 1000W LED or HID | ts1162 installation manual

Use the provided screws to fix the backplate to the wall or junction box.

Double-check that the bracket is securely fastened and can support the weight of the TS1162. Step 4: Electrical and Signal Wiring

Hold the mounting bracket against the wall at the desired height. Note: Always verify the wiring diagram printed directly

: Use the provided mounting template to mark screw holes. Ensure the tamper lever

Ensure your local power supply matches the voltage requirements listed on the TS1162 product label.

: Detailed technical specifications and diagrams can be found in the Tecom TS1162 Datasheet at Ness Corporation. Double-check that the bracket is securely fastened and

Open the packaging carefully to avoid damaging the contents.

After configuration, verify the system is working correctly.

Drill the holes based on the specified size in the installation guide.

If you encounter issues, consult the troubleshooting section of your main Challenger installation manual. For persistent problems, contact technical support (details below).

This concludes the TS1162 installation manual. Retain for future reference.

Product Buy Download Support Contacts site map
Copyright © 1999 - 2026, AGG Software.
All rights reserved. Terms of use | Privacy policy