Switch on the main facility circuit breaker, then power up the X-ray generator.
Connect a calibrated non-invasive X-ray multimeter to the system. Take test exposures at low, medium, and high kVp/mA ranges. Compare the physical meter readings to the console values.
Perform a "tube seasoning" routine if the X-ray tube is brand new or has been idle for more than a month. This process gradually applies voltage to clear residual gases inside the vacuum insert. drgem x ray service manual install
Install the high-voltage cable and rotor cable, ensuring proper connection to the tube head.
Before releasing the system for clinical use, a final checklist must be completed and documented in the service log. Switch on the main facility circuit breaker, then
Tighten the securing rings completely by hand to prevent air gaps, which cause electrical arcing. Control and Signal Interconnects
Clean the HV cable terminals and the X-ray tube/generator receptacles using isopropyl alcohol and lint-free wipes. Compare the physical meter readings to the console values
Ensure walls are lead-lined according to local radiation standards. Observation windows should use lead glass positioned approximately 800–850 mm from the floor.
Perform the "9-penny test" or use a commercial alignment tool to verify that the light field matches the actual X-ray exposure field.