Kes Geyser Load Control Timer Manual New !!better!! — Ad-Free
The internal backup battery is fully drained, or the main power supply from the DB board is turned off.
This comprehensive manual provides complete instructions for installing, programming, and troubleshooting your new KES Geyser Load Control Timer. 1. Safety Warnings and Technical Specifications Critical Safety Precautions
: Permanently OFF, though manual override is still available outside of peak times. Manual Override : Press the "Override"
Press the button a second time. The text "1 OFF" will appear on the screen.
Don't let the complex settings scare you. The secret is in the scheduling: Heat water only when you need it. kes geyser load control timer manual new
Ensure the timer is set to . Press the "Manual" or "Override" button until the indicator points to "AUTO". If left on "ON" or "OFF", the timer will not follow your programmed schedule. 4. Troubleshooting & Tips
Press the button once. The screen will display 1 ON on the left side. Press D+ to choose your day block. Options include: Single days (e.g., Monday only). Mon–Fri (Workdays). Sat–Sun (Weekend). Mon–Sat or Mon–Sun (Full week).
Press the to exit programming mode and return to the main time screen. Deleting a Specific Program Block
Note: Repeated boosting defeats load control purpose and may cause main breaker trips. The internal backup battery is fully drained, or
| Error Display | Meaning | Solution | |---------------|---------|----------| | | Internal memory failure | Press RST with a pin. If persists, replace timer. | | E2 | Battery low (below 2.5V) | Replace internal rechargeable battery (CR2032 or soldered type). | | E3 | Load limit exceeded repeatedly | Reduce other appliances (stove, dryer) or increase load limit setting. | | - - : - - on clock | No time set | Long press SET and reprogram time. | | Flashes “Ld” but grid is stable | Faulty ripple signal or wiring | Call electrician to test R1/R2 terminals. | | Geyser not heating in MAN mode | Tripped internal relay | Check output terminal voltage with multimeter. |
An hour later, a courier slipped a thin, brown envelope under her door. Taped to the front was a sticky note: “New model. Manual inside. You install. I’m busy.”
is designed to manage this, allowing you to heat water only when necessary.
Connect the wire going to the geyser to the terminal marked LOUT or Terminal 3. Don't let the complex settings scare you
Geyser physical thermostat is set too low, element is damaged, or isolator switch is off.
Before programming, synchronize the timer to the local time: Press and hold the button.
Water heating accounts for up to 40% of the average household energy bill. Installing a KES Geyser Load Control Timer is one of the most effective ways to lower electricity costs by ensuring your geyser only operates when needed.
