Special offer:

Verify that the walkway width matches your model specifications (typically for standard lanes and for wide/ADA lanes). Step 2: Drilling Anchor Points Drill the anchor bolt holes using a masonry drill bit to a depth of

, comprehensive site preparation is necessary. The unit must be installed on a finished, flat, and level floor to ensure the glass panels operate smoothly and align correctly Structural Integrity:

Utilize the available output relays (Normally Open/Common) to send a clean pulse back to the access control panel confirming a successful passage. Emergency Fire Alarm Interface

Mark the exact drilling locations for the floor anchors and cable entry points. Step 2: Drilling and Anchoring

The GC01 control board is the main interface for configuring the SpeedStile FL. Key tasks performed through the GC01's interface include:

Precise mechanical alignment prevents premature wear on the drive motor and ensures flawless glass panel synchronization. Step 1: Marking and Positioning

Use a chalk line or laser level to mark the center line of the security lane on the floor.

The SpeedStile FL features an advanced infrared sensor array to detect tailgating and unauthorized entry.

Inspect internal drive belts for wear; check tightness of floor anchors.

Carefully bolt the glass panels onto the drive rotor assembly using the supplied rubber gaskets and torque screws. Do not over-tighten, as this can crack the glass.

Connect a dedicated, normally closed (NC) dry contact loop from the building’s Fire Alarm Control Panel (FACP) to the emergency override terminals on the Gunnebo motherboard.