Digi Sm500 Scale User Manual: _top_
A : For commercial applications requiring high accuracy, calibration is recommended every 3–6 months or immediately after any impact or suspected incorrect weighing.
Pull the printhead release lever to lift the thermal printhead. Remove the empty plastic core from the supply spindle.
Features programmable PLU keys for fast item selection. digi sm500 scale user manual
Operation of the SM-500 typically involves three primary modes: , Programming , and Setup . 1. Setup and Assembly
Check if label roll is empty or misaligned in the printer feed. PLU Not Found A : For commercial applications requiring high accuracy,
Non-standard gravitational variance? Jin laughed. He lived on the 14th floor of a concrete high-rise. Was the scale measuring his building’s sway? He set the mug back down. 247.3 g. Then he lifted the mug, set it down again. 247.5 g. He frowned.
Follow these steps exactly before using the scale for daily commercial transactions. Leveling the Scale Features programmable PLU keys for fast item selection
Close the printer door and press the key to test alignment. 3. Keyboard Functions and Operation Modes
Position the scale on a flat, solid counter free from vibrations and direct air currents (like AC vents).
Ethernet/Wireless LAN connectivity for easy data transmission.
