Virar-alibaug Multimodal Corridor Route Map -
is notorious for its congested roads and overburdened railway lines. To decongest the existing infrastructure and spur economic growth along the coastal stretch, the Mumbai Metropolitan Region Development Authority (MMRDA) has conceived one of its most ambitious projects to date: the Virar-Alibaug Multimodal Corridor (VAMC) .
The is an approved 126-kilometer-long, 8-to-14-lane access-controlled greenfield mega-expressway engineered to transform the infrastructure landscape of the Mumbai Metropolitan Region (MMR) . Spearheaded by the Maharashtra State Road Development Corporation (MSRDC) , this ₹55,000+ crore lifetime project bypasses Mumbai's highly saturated inner urban core. It bridges the northern and southern peripheries of the metropolis, slinging travel times between Virar and Alibaug from a tedious 4 to 5 hours down to a swift 1.5 to 2 hours .
This is the primary and most extensive leg of the project. The stretch connects Navghar in Palghar district to Balavali in Pen taluka, Raigad district. This phase traverses through the talukas of Vasai, Bhiwandi, Kalyan, Ambernath, Panvel, Uran, and Pen, covering 104 villages . The approved estimated cost for Phase 1 is Rs 31,793 crore .
[Insert Infographic]
The is a 126 km, 14-lane access-controlled expressway designed to connect the northern and southern outskirts of the Mumbai Metropolitan Region (MMR). Route Overview
: The route connects seven strategic hubs: Virar, Bhiwandi, Kalyan, Dombivali, Panvel, Taloja, and Uran.
The is a planned 126-kilometer mega-infrastructure project designed to establish a high-speed transit loop around the outer periphery of the Mumbai Metropolitan Region (MMR) . Implementing agency Maharashtra State Road Development Corporation (MSRDC) recently shifted Phase 1 execution to a Public-Private Partnership (PPP) model under the Build-Operate-Transfer (BOT) framework, establishing a targeted operational deadline of 2030 . This extensive corridor acts as a foundational connectivity spine bypass, directly linking growth centers across three administrative districts: Palghar, Thane, and Raigad. virar-alibaug multimodal corridor route map
Enhanced connectivity to the coastal beaches of Alibaug and the Konkan region. Conclusion
The corridor's route is strategically designed to bypass the congested urban core of Mumbai, connecting major growth centers and national highways.
This 96.41 km segment is designed to be a 14-lane, access-controlled expressway that will serve as the corridor's backbone. Its alignment will pass through numerous villages and connect multiple strategically important locations, including: is notorious for its congested roads and overburdened
The project's feasibility report from the Ministry of Environment, Forest and Climate Change (MoEF&CC) initially noted . However, more recent government approvals have specified that the route map will feature nine key interchanges . These interchanges will provide critical links to major landmarks and transport corridors, including:
True to its name, the VAMMC route map incorporates multiple modes of transport:
Search for "MMRDA VAMC Phase 3 map" for the most current southern extension details, as Phase 1 (Virar to Shilphata) is already under active construction. The stretch connects Navghar in Palghar district to
The nine interchanges will directly link the expressway to:
: Over ₹55,000 crore , with a large portion dedicated to land acquisition.